Located in Getafe—just 12 km from central Madrid—this advanced facility is engineered for high performance, sustainability, and AI scalability. The Madrid-Getafe data center delivers 20 MW of critical capacity within 22,900+ m² of purpose-built space and supports rack densities up to 70 kW with air cooling or 200 kW with plug-and-play liquid cooling. Powered entirely by renewable energy and backed by 32 MW of clean HVO biofuel generators, the site offers a 100% uptime SLA and real-time energy metering.
This facility is a sustainability leader with a market-leading 1.15 PUE and zero water waste cooling. Strategically positioned in Spain’s central fiber and logistics corridor, it connects to undersea cables via Bilbao, Barcelona, and Lisbon, providing global reach with ultra-low latency. Madrid-Getafe is a future-ready location for AI workloads, cloud-native deployments, and enterprise IT seeking efficiency and scale.