About Tonaquint - Oklahoma City
State-of-the-art facility established in 2010 with a total size of 64,942 Sq. Ft. Featuring a raised floor area of 10,000 usable Sq. Ft. (with an additional 10,000 sq. ft. available) and a floor load capacity of 250 PSF. Enjoy around-the-clock building access and top-notch security including biometric systems, video surveillance, and on-site personnel at all times. The loading area includes a 10’x11’11″ dock door with hurricane rated storm door and Dock Lift Platform.
Carrier neutral options with AT&T, Verizon, Cox (CLEC), Dobson for seamless connectivity. Reliable commercial power from OG&E with a primary and secondary substation totaling 8 Megawatts and expanding to an additional 2.5 MW by the end of 2024.
Equipped with three 2,000kW MTU Detroit Diesel Generators and three Schneider Electric Galaxy VX 1250 kW UPS for backup power. Fire suppression system in place along with HVAC systems including water-cooled chillers, air-cooled chillers, CRAH units, and cooling towers.
Customer working space includes secure staging/storage areas, office suites, conference room, workstations, and TV entertainment lounge for your convenience.