Full Cabinet Colocation 2kW Elk Grove, IL Chicago ORD2
Located in ORD2 (Chicago) Elk Grove Village Data Center Campus (2425 Busse Road, Elk Grove Village, IL, USA)
SpaceFull cabinets (1+)
Product power2 kW
Power circuit30A/208 AC
Speed100 Mbps
IPs/29 (8 usable)
Term1 year
Price
Sale ends on Dec 31
Start an RFP and get a proposal for your custom requirements
* No payment required.

Centersquare Full Cabinet Colocation 2kW Elk Grove, IL Chicago ORD2

Cyxtera Chicago colocation pricing! Cyxtera just announced its "Fill the Cabinets" promotion! For a limited time, you can get a turn-key colocation cabinet with everything you need to rack and stack your IT gear and connect it to the Internet or your network provider of choice, with no install fees and a low monthly rate for the life of the contract. - No upfront cost. All setup fees waived. - Discounted monthly rates on colocation and connectivity for the life of the contract. - World-class data center operations team - Secure and reliable data center environment back by 100% uptime SLA. - Freedom to focus on growing your business instead of data center management.
A Global Platform
Cyxtera fulfills this need by offering a global data center platform comprised of more Uptime Institute M&O-approved data centers than any other provider in the world.
Security and Performance from the Ground Up
Each of our 50+ facilities is built to a minimum of N+1 redundancy and meets or exceeds the most advanced physical and technical requirements. Plus, 100 percent uptime SLAs and performance level.
Loading...

Data Center Specifications

Building Size: 163747 sqft
Colocation Space: 148000 sqft
Total Power: 11.6 kVa
Power Density: 0

Data Center Certifications

HIPAA:Ok
ISO 27001:Ok
NIST 800-53:Ok
PCI DSS:Ok
SOC 1:Ok
SOC 1 Type 2:Ok
SOC 2:Ok
SOC 2 Type 1:Ok
SOC 2 Type 2:Ok
SSAE 18:Ok

Other Centersquare Products